SERVICES

image9

I.- Detection, Arming and Presentation of Technified Landfill Project:

Initial contribution of Seed Capital, Volumetric consideration of the area of influence for management and confinement.

II.- Presentation of the Project for the Valuation of Permits and Authorizations Processing:

Advice for Selection of Technical-Legal Firm to adjust discrepancies and submit the alternative of investment resources, shareholding and or propose Private Public Association

III .- "MESEME"

It has the technical, administrative and operational team for the design, technology, processing of permits for the construction and operation of lateral plants for the generation of electrical energy and or the destruction of biogas generated by the Anaerobic reaction of leachate evaporation lagoons or confinement of liquids from Wastewater Treatment Plants 

image10

IV.- Urban Mechanized Collection of Solid Waste and

V.-Plant for the Selection and Recovery of Urban Solid Waste, Non-Dangerous.

V.-Plant for the Selection and Recovery of Urban Solid Waste, Non-Dangerous.

V.-Plant for the Selection and Recovery of Urban Solid Waste, Non-Dangerous.

image11

Selection of urban site or in the confinement for Design, construction and Installation according to land use; to design and build "Non-hazardous Urban Solid Waste Transfer Plant", "Turnkey" identifying alternative maneuverability to be used, with the Advice to offer Plant Construction Processes to participate in tenders and obtaining Public Contracts, Private.

VI.- Site selection for design.

V.-Plant for the Selection and Recovery of Urban Solid Waste, Non-Dangerous.

V.-Plant for the Selection and Recovery of Urban Solid Waste, Non-Dangerous.

image12

This is carried out for the construction and operation of Metanogenic Technified Sanitary Landfill, of the wet type, with leachate treatment, and evaporation lagoon, and processing of the confinement as a project as Clean Development Mechanism for the extraction of biogas for its control, measurement, destruction and use of the Greenhouse Gas as fuel in the production of renewable, electrical or thermal energy

VII.- Clean Development Mechanism Plant to incorporate and real Administration values.

Investment, Financing, Projection of Cost Benefit, Construction and Operation; incorporating measuring equipment, control of the Greenhouse Gas, destruction of Carbon Dioxide (CO2), use of methane fuel power (CH4), adjusting operating behavior values in the process.


Cost Analysis Benefit to add Co-Generation Project (“CHP”) for the commercialization of thermal or electrical energy produced.

1-Site evaluation and coverage:

3- Drilling and adaptation of Wells

1-Site evaluation and coverage:

image13

2- Control and access mechanism

3- Drilling and adaptation of Wells

1-Site evaluation and coverage:

image14

3- Drilling and adaptation of Wells

3- Drilling and adaptation of Wells

3- Drilling and adaptation of Wells

image15

4- Pneumatic extraction pumps

4- Pneumatic extraction pumps

3- Drilling and adaptation of Wells

image16

5- Dual purpose pump

4- Pneumatic extraction pumps

6- Unified extracted biogas

image17

6- Unified extracted biogas

4- Pneumatic extraction pumps

6- Unified extracted biogas

image18

7- Transportation of Biogas to Central

9.- Closed Flame Torch, subject to expectation

7- Transportation of Biogas to Central

image19

8- Biogas concentrating plant

9.- Closed Flame Torch, subject to expectation

7- Transportation of Biogas to Central

image20

9.- Closed Flame Torch, subject to expectation

9.- Closed Flame Torch, subject to expectation

9.- Closed Flame Torch, subject to expectation

image21

for the consumption in Operational Plant, installed on site, to process the biogas and through filtration, eradicate siloxanes and other pollutants and obtain Methane (CH4), to be used its fuel power in renewable, electrical and thermal energy production facility.